通風(fēng)管道在現(xiàn)代建筑中必不可少,它的的作用也是非常強(qiáng)大,山東通風(fēng)管道廠家提醒大家安裝通風(fēng)管道前要做好6個(gè)準(zhǔn)備工作:
Ventilation duct is indispensable in modern architecture, and its role is also very powerful. Shandong ventilation duct manufacturers remind you to make six preparations before installing ventilation ducts
1、根據(jù)所需安裝通風(fēng)管道的場所結(jié)構(gòu)及環(huán)境,進(jìn)行通風(fēng)管道設(shè)計(jì),確保通風(fēng)管道的實(shí)用性。
1. According to the structure and environment of the place where the ventilation pipe needs to be installed, the ventilation pipe is designed to ensure the practicability of the ventilation pipe.
2、一般送排風(fēng)系統(tǒng)和空調(diào)系統(tǒng)的通風(fēng)管道安裝,需在建筑物的屋面做完,安裝部位的障礙物已涪理干凈的條件下進(jìn)行。
2. In general, the installation of ventilation pipes for air supply and exhaust system and air conditioning system should be carried out under the condition that the roof of the building is finished and the obstacles at the installation position have been cleared.
3、一般除塵系統(tǒng)通風(fēng)管道安裝,需在廠房內(nèi)與風(fēng)管有關(guān)的工藝設(shè)備安裝完畢,設(shè)備的接管或吸、排塵罩位置已定的條件下進(jìn)行。
3. Generally, the installation of the ventilation pipe of the dust removal system should be carried out after the installation of the process equipment related to the air pipe in the plant and the position of the equipment connecting pipe or dust suction and discharge hood has been determined.
4、施工準(zhǔn)備工作已做好,如施工工具、吊裝機(jī)械設(shè)備、必要的腳手架或升降安裝平臺(tái)已齊備施工用科已能滿足要求。
4. The construction preparation work has been done well, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform are complete, and the construction department can meet the requirements.
5、要與土建施工密切配合,應(yīng)預(yù)圖的安裝孔洞,預(yù)埋的支架構(gòu)件均已完好,并經(jīng)檢查符合設(shè)計(jì)要求。
5. To closely cooperate with the civil construction, the installation holes in the drawing and the embedded support components are in good condition and meet the design requirements after inspection.
6,通風(fēng)及空調(diào)系統(tǒng)管路組成的各種通風(fēng)管道、部件、配件均已加工完畢,并經(jīng)質(zhì)量檢查合格。
6. All kinds of ventilation pipes, components and accessories composed of ventilation and air conditioning system pipes have been processed and passed the quality inspection.
通風(fēng)管道只有在安裝前做好準(zhǔn)備才能保證后期安裝順利,也減少后期通風(fēng)管道使用過程中問題的發(fā)生
Only when the ventilation pipe is well prepared before installation, can it be installed smoothly in the later stage and reduce the occurrence of problems in the use of the ventilation pipe in the later stage通風(fēng)管道在現(xiàn)代建筑中必不可少,它的的作用也是非常強(qiáng)大,山東通風(fēng)管道廠家提醒大家安裝通風(fēng)管道前要做好6個(gè)準(zhǔn)備工作:
Ventilation duct is indispensable in modern architecture, and its role is also very powerful. Shandong ventilation duct manufacturers remind you to make six preparations before installing ventilation ducts
1、根據(jù)所需安裝通風(fēng)管道的場所結(jié)構(gòu)及環(huán)境,進(jìn)行通風(fēng)管道設(shè)計(jì),確保通風(fēng)管道的實(shí)用性。
1. According to the structure and environment of the place where the ventilation pipe needs to be installed, the ventilation pipe is designed to ensure the practicability of the ventilation pipe.
2、一般送排風(fēng)系統(tǒng)和空調(diào)系統(tǒng)的通風(fēng)管道安裝,需在建筑物的屋面做完,安裝部位的障礙物已涪理干凈的條件下進(jìn)行。
2. In general, the installation of ventilation pipes for air supply and exhaust system and air conditioning system should be carried out under the condition that the roof of the building is finished and the obstacles at the installation position have been cleared.
3、一般除塵系統(tǒng)通風(fēng)管道安裝,需在廠房內(nèi)與風(fēng)管有關(guān)的工藝設(shè)備安裝完畢,設(shè)備的接管或吸、排塵罩位置已定的條件下進(jìn)行。
3. Generally, the installation of the ventilation pipe of the dust removal system should be carried out after the installation of the process equipment related to the air pipe in the plant and the position of the equipment connecting pipe or dust suction and discharge hood has been determined.
4、施工準(zhǔn)備工作已做好,如施工工具、吊裝機(jī)械設(shè)備、必要的腳手架或升降安裝平臺(tái)已齊備施工用科已能滿足要求。
4. The construction preparation work has been done well, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform are complete, and the construction department can meet the requirements.
5、要與土建施工密切配合,應(yīng)預(yù)圖的安裝孔洞,預(yù)埋的支架構(gòu)件均已完好,并經(jīng)檢查符合設(shè)計(jì)要求。
5. To closely cooperate with the civil construction, the installation holes in the drawing and the embedded support components are in good condition and meet the design requirements after inspection.
6,通風(fēng)及空調(diào)系統(tǒng)管路組成的各種通風(fēng)管道、部件、配件均已加工完畢,并經(jīng)質(zhì)量檢查合格。
6. All kinds of ventilation pipes, components and accessories composed of ventilation and air conditioning system pipes have been processed and passed the quality inspection.
通風(fēng)管道只有在安裝前做好準(zhǔn)備才能保證后期安裝順利,也減少后期通風(fēng)管道使用過程中問題的發(fā)生
Only when the ventilation pipe is well prepared before installation, can it be installed smoothly in the later stage and reduce the occurrence of problems in the use of the ventilation pipe in the later stage