風(fēng)管以及部件的安裝注意事項!

來源:http://www.fsjt-gov.com 日期:2019-08-01 發(fā)布人:admin

  通風(fēng)管道及部件的安裝,土建工程應(yīng)根據(jù)風(fēng)道安裝及暗安裝條件,有必要有一定條件進行。表面安裝或技能夾層內(nèi)管道安裝,部分應(yīng)安裝在通風(fēng)管道工程和建筑完成或受到審查,畫完成,將來如果通風(fēng)管安裝后,山東通風(fēng)管道土木工程技術(shù)人員和其他操作,可能會損壞通風(fēng)管,空氣凈化系統(tǒng),特別是會使管道污染。對于安裝暗色安裝管道,應(yīng)及時配合土建施工,否則會損壞土建裝修吊頂、墻面。
  The installation of ventilation pipes and components should be carried out in accordance with the conditions of installation of ventilation pipes and dark installation, and it is necessary to have certain conditions. Surface installation or skill installation of pipeline in sandwich should be partly installed in ventilation pipeline engineering and construction, or be examined and painted. In the future, civil engineering technicians and other operations of Shandong ventilation pipeline may damage ventilation duct, air purification system, especially the pipeline pollution if the ventilation duct is installed. For installation of dark pipes, civil construction should be coordinated in time, otherwise the ceiling and wall of civil decoration will be damaged.
  在施工過程中,特殊人員應(yīng)該分配給密切合作與土木工程根據(jù)土木工程的時間表,以保證預(yù)埋件預(yù)留孔和鋪設(shè),以避免材料的浪費,對土木工程的質(zhì)量的影響。上班前一季度的安裝和安裝之前管道系統(tǒng)安裝前準(zhǔn)備工作,應(yīng)進一步驗證管和回(行)風(fēng)口軸線和標(biāo)高、等符合設(shè)計圖紙,并查看公民預(yù)留洞、預(yù)埋件的方向符合需求,根據(jù)施工計劃決定安排勞動力,和預(yù)制分支,懸掛,支架,風(fēng)管按照施工順序安排運到現(xiàn)場。
  During the construction process, special personnel should be allocated to cooperate closely with civil engineering according to the schedule of civil engineering, in order to ensure the pre-embedded parts reserved holes and laying, in order to avoid waste of materials and the impact on the quality of civil engineering. Before the installation and installation of the pipeline system in the first quarter of work, the preparatory work before installation should further verify that the axis and elevation of the pipe and return (line) tuyere meet the design drawings, and check the direction of the reserved holes and embedded parts for citizens to meet the requirements. According to the construction plan, the labor force, prefabricated branches, suspensions, brackets and ducts should be arranged according to the construction plan. Sequence arrangement for delivery to site.
山東通風(fēng)管道
  同時,施工輔助材料(螺栓、螺母、墊片和粘合劑、密封劑等)和必要的安裝材料也都準(zhǔn)備好了,根據(jù)工作量和系統(tǒng)的多少節(jié)進行安裝。
  At the same time, construction auxiliary materials (bolts, nuts, gaskets and adhesives, sealants, etc.) and necessary installation materials are also prepared, according to the workload and the number of sections of the system for installation.
  可安裝風(fēng)管首先需要的東西有:扳手、鋼絲鉗、螺絲刀、鋼鋸、錘子、扁鑿、沖頭、錘子、鋼帶、水平儀、滑輪、麻繩等。
  The first things needed to install the air duct are wrenches, wire pliers, screwdrivers, steel saws, hammers, flat chisels, punches, hammers, steel belts, levelers, pulleys, hemp ropes, etc.