如今很多場所下都需要進(jìn)行風(fēng)管安裝,以保證場所下的通風(fēng)工作,保證環(huán)境下的整潔和設(shè)備安全使用,當(dāng)然在安裝時也要采用正確的方法,那么通風(fēng)管道安裝方法是什么?跟隨高氏一起看下吧。
improve air circulation Follow Gao to have a look.
(1)風(fēng)管組裝:當(dāng)風(fēng)管較短時,可一次在地面組裝而成,當(dāng)風(fēng)管較長時,可視安裝場地的情況,在地面分段組裝。組裝時應(yīng)盡量調(diào)整風(fēng)道的度和水平度,避免風(fēng)管扭曲或上下起波,左右擺龍,每段風(fēng)道不宜超過10m。
(1) Air duct assembly: when the air duct is short, it can be assembled on the ground at one time. When the air duct is long, it can be assembled in sections on the ground according to the situation of the installation site. During assembly, the center and levelness of the air duct should be adjusted as far as possible to avoid the distortion of the air duct or wave up and down, and the left and right swing dragons. Each section of the air duct should not exceed 10m.
組裝時,墊片應(yīng)墊平,法蘭螺栓應(yīng)均勻擰緊,螺母帽均朝向同一方向。
During assembly, the gasket should be padded flat, the flange bolts should be tightened evenly, and the nut caps should face the same direction.
(2)風(fēng)管就位:風(fēng)管就位前應(yīng)檢查全部支架的水乎度和標(biāo)高、檢查支架的牢固程度,風(fēng)管就位可采用直接和吊具兩種方法。對風(fēng)管斷面較小,又位置較低的可采用人工就位方法,只需搭設(shè)簡易腳手架即可。
(2) Air duct in place: before the air duct is in place, check the water tightness and elevation of all supports, and check the firmness of supports. Direct and sling methods can be used for air duct in place. If the cross section of the air duct is small and the position is low, the manual positioning method can be adopted, and the simple scaffold can be set up.
當(dāng)風(fēng)管斷面較大且管段較長時,可采用滑輪、倒鏈、大繩等方法吊裝。世紀(jì)星介紹為了便于風(fēng)道就位,一般多采用將風(fēng)道吊在腳手架上,然后再將其抬放在風(fēng)道支架上的方法。腳手架應(yīng)沿其風(fēng)道長度方向搭設(shè),高度和位置應(yīng)適合施工操作,吊裝順序應(yīng)先干管后支、立管,吊起時,吊點應(yīng)牢固,兩吊點應(yīng)均勻受力。
When the cross-section of air duct is large and the pipe section is long, pulley, chain block, rope and other methods can be used for hoisting. Century Star introduces that in order to make the air duct in place, the air duct is usually hoisted on the scaffold, and then lifted on the air duct bracket. The scaffold shall be erected along the length of its air duct, and the height and position shall be suitable for construction operation. The hoisting sequence shall be the main pipe first and then the support and riser. When hoisting, the hoisting points shall be firm, and the two hoisting points shall be evenly stressed.
(3)風(fēng)道調(diào)直:就位在支架上的風(fēng)道,應(yīng)撥正位置,調(diào)整風(fēng)道橫平豎直,然后再按圖集要求固定。
(3) Air duct straightening: the air duct in place on the bracket should be straightened, adjusted horizontally and vertically, and then fixed according to the requirements of the atlas.
以上是雙恩空調(diào)有關(guān)通風(fēng)管道安裝的具體介紹,在通風(fēng)管道安裝時需要采用正確的方法,按照流程操作,保證順利完成安裝。